🚀 Scan to BIM: Proven Time Savings in Construction


Research shows that Scan to BIM technology saves an average of 59.5% project time, with even greater results in specific areas:


🔹 Automated Processes – Up to 90% faster using advanced automation.
🔹 Less Rework – 85% improvement, cutting errors that used to take 12–15% of project time down to just 1–3%.
🔹 BIM Model Creation – 50% faster for HVAC and MEP with scanning workflows.
🔹 Inspection – Quality checks cut by 71%, from 7 days to only 2 days.
🔹 Drone & Mobile Scanning – Up to 70% quicker site data capture; UAV LiDAR surveys finished in 1 day instead of 10.
🔹 Drone Corridor Mapping – 80–85% faster than traditional methods.


📈 Real Impact:
A 15-story renovation project saved 1,143 hours, and full BIM adoption shortened schedules by 35%.


With tools like laser scanning, drones, and mobile capture, tasks that used to take weeks now take just hours—without losing accuracy. Scan to BIM speeds up delivery, improves precision, and reduces costly rework across construction projects.


💡 Want similar results for your project? Let’s talk about how Scan to BIM can save time, cut errors, and improve efficiency.


🔗https://www.teslacad.co.uk/point-cloud-to-bim-services.php


#ScanToBIM #BIMModeling #ConstructionTechnology #DigitalConstruction #LaserScanning #DroneMapping #AEC #BIM #MEP #Architecture #Engineering #Construction #ConstructionTech

More Posts

Tesla CAD UK Ltd

  • 17 Plantagenet Road
    Barnet, London EN5 5JG
    United Kingdom
  • +44 3330119045